Project: Sanitary Contract No. 1027 for Rehabilitation and Improvements to Sanitary Sewers At Various Locations in Baltimore

IPR Northeast, LLC – ITB: Certified MBE/WBE/SLBE Firms

Project: Sanitary Contract No. 1027 for Rehabilitation and Improvements to Sanitary Sewers At Various Locations in Baltimore

Project Location: Baltimore City, MD

Bid Due Date: 01-12-2022

Quotes Returned: 01-10-2022


Scopes:

  • Pre CCTV/Clean
    • 200,000 LF of 6-12” Dia. Sanitary Sewers
    • 10,000 LF of 15-30” Dia. Sanitary Sewers
    • 40,000 LF of Heavy Cleaning of 6-30” Dia. Sanitary Sewers
    • Specialty Cleaning of 6-30” Sanitary Sewers
  • Open Cut
    • 1000+ LF of Point Repairs 6-24” Sanitary Sewer
    • Point Repairs of Sanitary Sewer Laterals
    • Lamphole Abandonment
    • Trench Excavation
    • Cleanout Installation
    • Pre-Cast Manhole Installation
    • Drop Connection Install
    • Manhole Cover and Frame
    • Various Backfill
    • Flowable Fill
    • Boulder Excavation
    • Construction Entrance
    • Utility Access Road
    • Chain Link Fencing
    • Privacy Fencing
    • Fence Resetting
    • Concrete Encasement
    • Orange Construction Fencing
    • Test Pits
    • Portable Sediment Tank
    • Manhole Adjustments/Resets/Grade Rings
  • Pipe Bursting
    • 6-12” Pipe Bursting
    • Bursting of Service Laterals
    • Reinstate House Connection
    • Reinstate Open Manholes
  • Manhole Rehab (Approved Materials- Strong Seal MS-2C, Permacast MS-10,000, Sewpercoat, Aluminaliner)
    • Cementitious Manhole Coating
    • Resin Manhole Coating
    • Manhole Frame Seals
    • Rebuild Bench and Invert
    • Epoxy Manhole Coating (Approved Materials- Mainstay DS-5 by Madewell, SEL-80HB by Parson Environmental, and Raven 405 by Raven Lining Systems)
  • Paving/Concrete/Asphalt
    • Pedestrian Footpath
    • Removal of Bituminous Paving Material
    • Variable Depth Subgrade using Crusher Run
    • Hot Mix Asphalt Paving
    • Pavement Patching
    • Concrete Patching
    • Thermoplastic Pavement Marking
    • Concrete Curb and Gutter
    • 5” Concrete Sidewalk
    • 5” Concrete Sidewalk with Brick
    • Warning Pavers
  • Lateral Rehab
    • CIPP Spot/Point Repairs
    • 3000+ LF of Lateral Lining
    • Lateral CCTV/Cleaning
  • Grouting
    • Grouting of Sanitary House Connections
    • Non-Structural Grout for Sanitary House Connections
    • Structural Grouting
    • Epoxy or Polyurethan Grouting of Manhole Walls
    • Sealing of Manhole walls with Cementitious Mortar
  • Bypass
    • Turnkey bypass setup for 2.0 MGD
    • Turnkey bypass setup for greater than 2.0 MGD up to 5.0 MGD
    • Turnkey bypass setup for greater than 5.0 MGD up to 10.0 MGD
  • Erosion/Sediment Control/Landscaping
    • Tree Removal
    • Silt Fencing
    • Storm Drain Inlet Protection
    • Tree Protection Fencing
    • Seeding
    • Sodding
    • Mulching
    • Topsoil
    • Tree Planting
  • Traffic Control
    • 431 SF of Temporary Traffic Signs
    • 30 EA Type III Barricades
    • 250 EA Plastic Traffic Control Drums
    • 25 Days Arrow Panel
    • 20 Days Portable Variable Message Signs (PVMS)
    • 50 Days Flagger, Traffic Control
    • 250 LF of Preformed Pavement Marking Line
    • 125 LF of Temporary Concrete Barrier
    • 50 EA Crash Cushion Sand Filled Plastic Barrels

Specs/Plans/Questions – Crystal Galvan | [email protected]| (678) 436-6814 