PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: Great Lakes Water Authority – Rehabilitation of Northwest Interceptor – 8 Mile to Tireman

Inland Waters Pollution Control, Inc.

ITB: DBE / MBE / WBE / SBE Firms

Project: Great Lakes Water Authority – Rehabilitation of Northwest Interceptor – 8 Mile to Tireman

Project Location: Detroit, MI                                                                                

Bid Due Date: 2/28/2022

Quotes Returned: 2/23/2022


Scopes:

  • Traffic Control
  • Excavation and Manhole replacement
  • Curb & Gutter Restoration
  • Manhole Frame and Cover Replacement
  • Grouting
  • Sewer Patching
  • Flow Control

Specs/Plans /Questions– Crystal Galvan | [email protected] | 678-436-6814 

Related Posts