Project: Wastewater Collection System Rehabilitation | 30” Cured In Place Pipe for Bel Ann Drive 2022

PM Construction and Rehab, LLC – Certified DBE Firms

Project: Wastewater Collection System Rehabilitation | 30” Cured In Place Pipe for Bel Ann Drive 2022

Project Location: Lafayette, LA

Bid Due Date: 3-08-2022

Quotes Returned: 3-03-2022


Scopes:

  • Pre CIPP Sanitary Sewer CIPP & Cleaning – 237110
    • 30” Main , 340 LF
    • Root Removal
    • CCTV Inspection
  • Bypass – 562998
    • Turnkey bypass setup and operation for 30” Sewer segment being lined

Specs/Plans /Questions– Crystal Galvan | [email protected] | 678-436-6814 