PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: Avenue G and H Sanitary Sewer Line and Manhole Rehab | CDBG Project No: B-21-UC-48-0005

PM Construction & Rehab, LLC dba IPR South Central – ITB: HUD Section 3 Certified Firms

Project: Avenue G and H Sanitary Sewer Line and Manhole Rehab | CDBG Project No: B-21-UC-48-0005

Project Location: Freeport, Texas

Bid Due Date: 4-14-2022

Quotes Returned: 4-11-2022


Scopes:

Pre & Post Pipe Burst CCTV & Cleaning Sanitary Sewer

8” Dia. – 275 LF

10” Dia. – 1,265 LF

Internal Obstruction Removal (including protruding tap removal)

Manhole Rehabilitation

5 EA

ACCEPTABLE MANUFACTURERS

A. Cementitious Structural Liner

1. The Strong Co, Inc. – Strong Seal MS-2C

2. Quadex Aluminaliner calcium aluminate sewer rehabilitation mortar (min. 1 inch/max. 3

inch thickness)

3. Pre-Approved Equal.

B. Protective Coatings

1. Environmental Coatings – Sewer Shield

2. Raven – Raven 405 products that meet the requirements of Raven Concrete

3. Quadex Structure Guard Epoxy

4. Sauereisen – Sewerguard

5. Pre-Approved Equal. Proposed equal must be submitted in writing to and approved by

C. Calcium Aluminate

1. SewperCoat

Open Cut Utility Repairs

Remove & Replace 10” Sewer – 235 LF

Remove & Replace 8” Sewer – 275 LF

Replace manhole Cone, Grade Rings, Inflow Preventer, Frame & Cover , Including Concrete Blockout – 5 EA

Obstruction Removal by Excavation

Point Repair – 8” – 10” Main

Install Shallow manhole (0-4’ Depth)

Install Normal Depth Manhole (4 – 8’ Depth)

Material Suppliers

8” & 10” HDPE Pipe , SDR 19 , IPS

Mechanical Steel Strap Saddles

PVC Pipe & Fittings


Specs/Plans /Questions– Crystal Galvan | [email protected] | 678-436-6814

Related Posts