Project: FY 2023 Local Drainage Program (LDP) Contract #3
Project Location: Houston, TX
Bid Due Date: 09/01/2022
Quotes Returned: 08/30/2022
Scopes:
- Cleaning
- Blast Cleaning of pavement markers
- Storm Sewer cleaning 18” – 72”, and box sewers
- CCTV storm sewers Smaller than 30” – 96”, box culverts
- Traffic Control Plan
- Traffic Control – Flaggers, Lane closures, standard signs and cones
- Traffic Control and Regulation
- Tree and plant Protection
- PPCA
- Install, relocate, and remove concrete low profile traffic barriers
- Stabilized construction exit
- Traffic signs, install, relocate
- Chain link fence and gate
- TXDOT Safety end treatments
- Open Cut
- Remove and replace pipe bollards, Mailboxes
- Transportation and disposal of ground water
- Debris and trash (tires, all sizes) removal and dispose of in landfill
- Clearing and grubbing
- Mowing
- Herbicide
- Remove and dispose of trees up to 36” diameter
- Zero curb cutback
- Checker-plate
- Remove and dispose of, and install existing concrete curb and gutter
- Remove and dispose of, and install asphaltic surface with and wo/base, gravel driveways, concrete pavements, misc. concrete and masonry
- Milling
- Remove and dispose of, and install concrete sidewalks, wheelchair ramps, driveways
- Roadway excavation
- Lime stabilizer
- Cement stabilized sand
- Saw cut concrete and asphalt
- Type A & D Hot Mix Asphaltic
- Flexible base
- Reinforced concrete pavement 6” – 12” thick
- High early strength 6” – 12”
- Street Lighting
- Temporary remove pavement markers, and install Thermoplastic markers
- Loop detector
- Flowable fill
- Point repairs
- Ground water control
- Trench safety plan
- Manhole adjustments
- Remove and replace manholes, storm sewer heads, storm pipe, leads, box culverts, trench drain inlets, junction boxes
- Grout fill abandon storm sewers 30” – 72”
- Grade Rings – 18” – 72” Storm sewer
- Elliptical or Arch pipe by open cut
- Storm, culverts RCP by open cut 18” – 90”
- Augering 24” – 36”
- Storm Tunnel 42” – 78”
- Box storm sewers 3×1 – 8×8 open cut
- CMP storm sewer outfall with and wo/ Timbers
- Rip rap, Geotextile, topsoil
- Reinforced concrete Channel lining
- Gabion
- Inlets Type A, B-B, C, E
- Sliplining
- Fire Hydrant assembly
- Water lines removed, dispose, install with and wo/meter box
- Cut and plug abandon water lines
- Wet connections
- Manhole Rehabilitation
- Lining
- Landscaping
- Tree planting
- Drop inlet baskets
- Inlet protection barriers
- Sandbag and straw bale barriers
- Sediment traps at storm inlet
- Filter fabric barrier
- Storm water pollution prevention structures
- Brush berm
- Sediment basin w/pipe or stone outlet
- Hydromulch seeding
- Sodding
Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624