PM Construction & Rehab, LLC – ITB: Certified D/M/WBE firms
Project: Sanitary Sewer Rehabilitation by Cured-In-Place Pipe Method – 4258-84
Project Location: Houston, TX
Bid Due Date: 08/25/2022
Quotes Returned: 08/22/2022
Scopes:
- CCTV/Cleaning (562998)
- Cleaning of Sewers 30” – 72”
- Cleaning of Siphons 8” – 48”
- Debris Collection, Removal and Disposal
- TV Inspection 30” – 72”
- TV Inspection with Dye
- TV Inspection of Siphon 12” – 48”
- Obstruction Removal by Remote method
- Traffic Control (561990)
- Uniformed peace officer
- Non uniformed peace officer
- Supplier (326199)
- Precast manholes 4’ and 5’ diameter
- Fiberglass 4’ and 5’ diameter
- HDPE Pipe for Bursting
- PVC pipe for point repairs and lateral reconnect (lateral and cleanouts included)
- Manhole Rehab (237110)
- 1” thick concrete liners
- Rehab manhole Bench and Inverts
- Chemical Grouting of manholes
- Grouting setup for manholes
Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624