PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: Sanitary Sewer Rehabilitation by Cured-In-Place Pipe Method – 4258-84

PM Construction & Rehab, LLC – ITB: Certified D/M/WBE firms

Project: Sanitary Sewer Rehabilitation by Cured-In-Place Pipe Method – 4258-84

Project Location: Houston, TX

Bid Due Date: 08/25/2022

Quotes Returned: 08/22/2022


Scopes:

  • CCTV/Cleaning (562998)
    • Cleaning of Sewers 30” – 72”
    • Cleaning of Siphons 8” – 48”
    • Debris Collection, Removal and Disposal
    • TV Inspection 30” – 72”
    • TV Inspection with Dye
    • TV Inspection of Siphon 12” – 48”
    • Obstruction Removal by Remote method
  • Traffic Control (561990)
    • Uniformed peace officer
    • Non uniformed peace officer
  • Supplier (326199)
    • Precast manholes 4’ and 5’ diameter
    • Fiberglass 4’ and 5’ diameter
    • HDPE Pipe for Bursting
    • PVC pipe for point repairs and lateral reconnect (lateral and cleanouts included)
  • Manhole Rehab (237110)
    • 1” thick concrete liners
    • Rehab manhole Bench and Inverts
    • Chemical Grouting of manholes
    • Grouting setup for manholes

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624