PM Construction & Rehab, LLC – ITB: D/M/WBE Certified Firms
Project: Sanitary Sewer Rehabilitation by Cured-In-Place Pipe Method – File No. 4258-88
Project Location: Houston, TX
Bid Due Date: 12/12/2022
Quotes Returned: 12/15/2022
Scopes:
CCTV & Cleaning Sanitary Sewer – 562998
- Pre CIPP-CCTV & Cleaning
- Siphon CCTV & Cleaning
- Dye Testing
- Obstruction removal by Remote
Open Cut Utility Repairs Sanitary Sewer – 238910
- Point Repairs
- Sewer Main Replacement
- Well Point / Dewatering
- Remove & Replace concrete manhole
- Remove & Replace FG Manhole
- Install Traffic Loop
- Adjust or Raise existing Manhole
- Sewer Cleanout Install
- Junction box Demolition and Install
- Service Reconnection by Excavation
Asphalt & Concrete Surface Restoration – 237310 / 238110
- Concrete Sidewalk & Driveway Replacement
- Concrete Curb Replacement
- Asphalt removal & Replacement
- Backfill
- Base removal & Replacement
- Milling & Overlay
- Concrete ADA Ramp Install
Manhole Rehabilitation – 237110
- 1” Concrete Liner
- Permacast
- Emaco
- Reliner
- Strongseal
- Rehab of benches & Inverts
- Manhole Chemical Grouting
- Grout abandonment of Sewer
Bypass Pumping – 237110
- 6” – 12” Dia. Pump setup & Operation
Landscaping – 561730
- Tree Removal & Replacement
Traffic Control – 561990
- Flagmen
Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624