PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: Service Line Replacement Project- Customer Side Phase 3

Inliner Solutions, LLC – ITB: D/W/S/MBE Certified Firms

Project: Service Line Replacement Project- Customer Side Phase 3

Project Location: Erie County, PA        

Bid Due Date: 11/12/2025

Quotes Returned: 11/07/2025

Scopes:

Plumber

  • Perform all plumbing connections within the home basement, including:
    • Connecting new copper service piping to the existing/new meter and interior water system
  • Install City-provided materials and equipment:
    • Water meters
    • Scotchlok connectors
    • End points
  • Install associated components:
    • Grounding strap
    • Meter couplings
    • Dual check valve
    • Expansion Tank

Restoration/ Paving

  • Asphalt.
  • Concrete.
  • Stone.
  • Brick.
  • Road – Temporary repairs.
  • Soil.
  • Mulch.
  • Seeding.

Exploratory Excavation

  • Open cut excavation.
  • Vacuum excavation.

Material Supply:

  • Type K Copper pipe 23,700LF.
  • Curb stops – Type B-25204N – 1/4 turn ball valve type.
  • Curb boxes -1″ extension type Model 5601-ALR Erie Pattern with arch pattern base – lid shall be 2 hole-Erie Pattern.
  • Pipe couplings/corporation stop adaptors – brass manufactured by Mueller Company, Ford Meter Box, or equal.
  • Freezer kit for water piping systems – shall be required to utilize CO2, Nitrogen, refrigeration.

Aggregate supply:

  • Backfill materials 2A
  • Cold patch
  • Hot Asphalt

Specs/Plans/Questions– Ashden Middlebrooks | ashden.middlebrooks@puriscorp.com | 470-503-5624