Inliner Solutions, LLC – ITB: D/W/S/MBE Certified Firms
Project: Service Line Replacement Project- Customer Side Phase 3
Project Location: Erie County, PA
Bid Due Date: 11/12/2025
Quotes Returned: 11/07/2025
Scopes:
Plumber
- Perform all plumbing connections within the home basement, including:
- Connecting new copper service piping to the existing/new meter and interior water system
- Install City-provided materials and equipment:
- Water meters
- Scotchlok connectors
- End points
- Install associated components:
- Grounding strap
- Meter couplings
- Dual check valve
- Expansion Tank
Restoration/ Paving
- Asphalt.
- Concrete.
- Stone.
- Brick.
- Road – Temporary repairs.
- Soil.
- Mulch.
- Seeding.
Exploratory Excavation
- Open cut excavation.
- Vacuum excavation.
Material Supply:
- Type K Copper pipe 23,700LF.
- Curb stops – Type B-25204N – 1/4 turn ball valve type.
- Curb boxes -1″ extension type Model 5601-ALR Erie Pattern with arch pattern base – lid shall be 2 hole-Erie Pattern.
- Pipe couplings/corporation stop adaptors – brass manufactured by Mueller Company, Ford Meter Box, or equal.
- Freezer kit for water piping systems – shall be required to utilize CO2, Nitrogen, refrigeration.
Aggregate supply:
- Backfill materials 2A
- Cold patch
- Hot Asphalt
Specs/Plans/Questions– Ashden Middlebrooks | ashden.middlebrooks@puriscorp.com | 470-503-5624