Project: Accelerated Lead Service Line Replacement Program

Inliner Solutions, LLC – ITB: S/M/WBE & Labor Surplus Certified Firms

Project: Accelerated Lead Service Line Replacement Program

Project Location: Providence, RI          

Bid Due Date: 12/01/2025

Quotes Returned: 11/24/2025

Scopes:

Asphalt Paving Subcontractor:

  • Perform temporary asphalt patching after trench backfill.
  • Sawcut edges and prep trench for final paving.
  • Install base and binder courses as required by Providence DPW.
  • Install final hot-mix asphalt to match existing pavement thickness.
  • Compact all lifts to DPW standards.
  • Perform infrared seam heating for moratorium streets
  • Install temporary pavement markings until final epoxy markings.
  • Clean site and remove all spoil and debris.

Concrete / Sidewalk Subcontractor:

  • Remove and replace concrete sidewalks following City of Providence standard details.
  • Replace full sidewalk panels (no partial patches).
  • Install ADA-compliant wheelchair ramps where required.
  • Install detectable warning panels per ADA/RI standards.
  • Replace concrete driveways and aprons to match thickness and finish.
  • Restore proper slopes to prevent ponding of water.
  • Form, place, finish, and cure concrete per Section 03301

Landscaping / Lawn Restoration Subcontractor:

  • Strip, remove, and dispose of unsuitable topsoil.
  • Install screened topsoil meeting spec requirements.
  • Fine grade disturbed areas to match existing contours.
  • Seed with approved RI standard mix; apply mulch and fertilizer.
  • Water and maintain until lawn establishment meets acceptance criteria.
  • Replace shrubs/vegetation disturbed during excavation (if applicable).

Granite Curb Subcontractor:

  • Remove/reset existing granite curb where disturbed.
  • Install new 7″ wide granite curb where required.
  • Install 2-ft radius granite curb returns at driveways and ADA ramps.
  • Backfill and compact behind curb per DPW standards.
  • Deliver excess curb to DPW yard (if required by permit).
  • Ensure all curb lines match existing grade and alignment.

Striping / Pavement Markings Subcontractor:

  • Install temporary pavement markings after paving.
  • Furnish and install final epoxy pavement markings per DPW standards.
  • Perform layout of centerlines, stop bars, lane lines, and crosswalks.
  • Remove temporary markings as required.

Traffic Control Subcontractor:

  • Provide trained/qualified flaggers per MUTCD.
  • Furnish traffic signs, cones, drums, and barricades.
  • Maintain safe pedestrian detours around sidewalk work.
  • Coordinate with City for police details (admin, not labor).
  • Install temporary sidewalk closures when needed.

Water Service Line Materials:

  • Type K Copper tubing (ASTM B88, NSF 61)
  • Polyethylene CTS water service tubing (PE 3408) for runs >100 ft
  • Brass compression fittings (AWWA C800)
  • Approved dielectric couplings (Harco or equal)
  • Corporation stops (ASTM B62, AWWA C800, lead-free)
  • Curb stops and curb boxes, including stainless steel rods
  • Warning tape
  • Electrical grounding clamps/components
  • Sediment/erosion control materials
  • Pitcher filters (Brita, PUR, Zero Water, etc.) + 6-month cartridges
  • Pipe sleeves
  • Penetration sealant
  • Swell strips (for waterproofing)
  • Insulation tape
  • Epoxy/grout
  • Mechanical sleeves
  • Epoxy-coated ductile iron tapping saddles, double-strap SS hardware

Backfill/paving materials:

  • Granular Fill (Processed)
  • Bank Run Gravel or Equivalent
  • Crushed Stone –  ¾” minus or 3/8″ stone
  • Pipe Bedding Material – Clean, angular stone
  • Select Backfill – Free of clay, organics, debris
  • Hot-mix asphalt (HMA)
  • Base course
  • Temporary asphalt
  • Infrared asphalt seam repair
  • Portland Cement Concrete (PCC) 4,000 psi
  • Wire mesh or rebar
  • ADA-compliant detectible warning panels for ramps
  • 7-inch granite curb
  • 2-foot radius granite returns for curb cuts

Testing:

  • Trenching, backfilling, and compaction
  • Granular fill materials
  • Concrete

Specs/Plans/Questions– Ashden Middlebrooks | ashden.middlebrooks@puriscorp.com | 470-503-5624