PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: Ashland Relief, Linwood, Second Avenue, & Shiawassee Sewers Rehabilitation

Inland Waters Pollution Control, Inc. – ITB: M/S/D/WBE Certified Firms

Project: Ashland Relief, Linwood, Second Avenue, & Shiawassee Sewers Rehabilitation

Project Location: GLWA – Detroit, MI

Bid Due Date: 10/01/2026

Quotes Returned: 09/29/2026

Scopes:

Pipe inspection:

  • 3D profiling of existing egg shape sewer

Manholes:

  • Manhole Frane and Cover replacement
  • Cone removal and replacement
  • Replace manhole steps

Fencing:

  • Wire fencing and access gate/barrier – sheet G06-112
  • 2 wire fence gates shown on G06-100 mulch on site
  • 2 Install Barrier Gates, – 20’ & 26’ wide

Clearing & grubbing

  • Site clearing and grubbing – sheet G06-112
  • Tree removal – Stump chip to 12″ below grade
  • 3,000 LF easement clearing/grubbing (Rouge River)
  • Removal of wire fencing, existing abandoned card reader, pedestal, and associated electrical equipment (3 locations)

Concrete:

  • Manhole – Mid-slope MH access platform per drawing
  • Shiawassee VR-17 Hatch Replacement

Specs/Plans/Questions– Ashden Middlebrooks | ashden.middlebrooks@puriscorp.com | 470-503-5624

Related Posts