Project: DWS-977 – Sewer Improvements throughout the City of Detroit, MI

Inland Waters Pollution Control – ITB: DBE Certified Firms

Project: DWS-977 – Sewer Improvements throughout the City of Detroit, MI

Project Location: Detroit, MI

Bid Due Date: 06/23/2025

Quotes Returned: 06/19/2025

Scopes:

Testing and reports

  • CIPP materials- physical and chemical properties testing per sample
  • Subsurface conditions at or adjacent to the Sites

Preconstruction services

  • Pre-construction Video and Photographic Records per site

Traffic control

  • Traffic control plans
  • Single lane closures

Manhole rehab

  • Manhole, Lining of Manhole

Safety

  • Safety Program

Landscape

  • Landscaping
  • Mulched Seeding
  • Sodding
  • Wood Fence, Remove and Replace, 4 foot
  • Wood Fence, Remove and Replace, 6 foot
  • Chain Link Fence, Remove and Replace, 4 foot
  • Chain Link Fence, Remove and Replace, 6 foot
  • Vinyl Fence, Remove and Replace, 4 foot
  • Vinyl Fence, Remove and Replace, 6 foot
  • Tree, Install
  • Tree, Remove, 6 inch to 18 inch Diameter

Paving

  • Sidewalk, Rem
  • Sidewalk, Conc, 4 inch
  • Sidewalk, Conc, 6 inch
  • ADA Ramp, w/ Curb
  • Curb Rem
  • Curb, Conc
  • Curb and Gutter, Rem
  • Curb and Gutter, Conc
  • Driveway, Rem
  • Driveway, Conc, 4 inch
  • Driveway, Conc, 6 inch
  • Pavement, Rem
  • Aggregate Base, No. 22A, 6 inch
  • Concrete Base, 8 inch
  • Concrete Base, 10 inch
  • HMA Pavement, Rem, Milling, 2 inch Depth to 4 inch Depth
  • HMA Pavement, 36A, 1.5 inch
  • HMA Pavement, 13A, 2 inch
  • HMA Pavement, 5E3, 1.5 inch
  • HMA Pavement, 4E3, 2 inchDA Ramp, w/ Curb

Specs/Plans /Questions– Ashden Middlebrooks | ashden.middlebrooks@puriscorp.com | 470-503-5624