PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: Culvert Rehabilitation

Inliner Solutions – ITB: DBE Certified Firms

Project: Culvert Rehabilitation

Project Location: Corinth, MS

Bid Due Date: 07/15/2025

Quotes Returned: 07/10/2025

Scopes:

  • Remove existing CMP pipe, dispose of off-site.  Pipe is approximately 8’ diameter (roughly 98”).
  • Case in place concrete headwall (2 total).
    • Concrete form work – erecting & stripping
    • Rebar installation/tying
    • Concrete pour & finish
    • Concrete supplier (truck to site)
    • Rebar supplier (deliver to site)
  • Rip Rap Installation (Size 300)
    • Install geotextile (type V) and rip rap (size 300) per plans
    • Supply rip rap (truck to site)
  • Install & remove temporary construction entrance
    • Install & remove temporary construction entrance
    • Supply construction entrance aggregate (truck to site)
  • Erosion Control
    • Supply silt fence material, sandbags, sediment filter bag, temporary seed/straw, permanent seed/straw
    • Install silt fence material, sandbags, sediment filter bag, temporary seed/straw, permanent seed/straw
  • Restoration grading activities
    • Finish grading
    • Topsoil placement
    • Supply topsoil (truck to site)
  • Project sign
  • Temporary dumpster service
  • Portable toilet rental & service

Specs/Plans /Questions– Ashden Middlebrooks | ashden.middlebrooks@puriscorp.com | 470-503-5624