Inliner Solutions, LLC – ITB: S/M/D/WBE Certified Firms
Project: Mann Subbasin Sewer Rehabilitation Contract No. 2 Collection System Improvements
Project Location: Cullman, AL
Bid Due Date: 03/28/2024
Quotes Returned: 03/25/2024
Scopes:
- CCTV / Cleaning (562998)
- Pre CIPP CCTV & Cleaning
- 8” – 12” Dia.
- Pre & Post Pipe Burst CCTV & Cleaning
- 8” – 12” Dia.
- Dye Testing
- Protruding Tap Removal
- Lateral Rehabilitation (237110)
- 4” & 6” Lateral Lining
- Lateral service Seals
- Manhole Rehabilitation (237110)
- Urethane Resin Liner
- Spray Wall , Sprayroq
- Solids, 100 %, Epoxy Coating Liner ,Raven 405
- Warren Environmental Systems 301-12 , Warren Environmental
- Fiberglass Insert
- L.F. Manufacturing Fiberglass Insert
- Urethane Resin Liner
- Open Cut Utility Repairs (238910)
- Point Repairs
- Manhole Install
- Manhole Riser Install
- Asphalt Restorations
- Concrete Restorations
- Cleanout Install
- External Lateral Reconnections
- Material Suppliers (326199)
- Pre Cast Manholes
- Manhole Frame & Covers
- HDPE Pipe & Fittings
- PVC Pipe & Fittings
- Cleanout Assembly
- Traffic Control (561990)
- Single Lane Closure with Flaggers
Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624