PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: Mann Subbasin Sewer Rehabilitation Contract No. 2 Collection System Improvements

Inliner Solutions, LLC – ITB: S/M/D/WBE Certified Firms

Project: Mann Subbasin Sewer Rehabilitation Contract No. 2 Collection System Improvements

Project Location: Cullman, AL

Bid Due Date: 03/28/2024

Quotes Returned: 03/25/2024

Scopes:

  • CCTV / Cleaning (562998)
  • Pre CIPP CCTV & Cleaning
    • 8” – 12” Dia.
  • Pre & Post Pipe Burst CCTV & Cleaning
    • 8” – 12” Dia.
  • Dye Testing
  • Protruding Tap Removal
  • Lateral Rehabilitation (237110)
    • 4” & 6” Lateral Lining
    • Lateral service Seals
  • Manhole Rehabilitation (237110)
    • Urethane Resin Liner
      • Spray Wall , Sprayroq
      • Solids, 100 %, Epoxy Coating Liner ,Raven 405
      • Warren Environmental Systems 301-12 , Warren Environmental
    • Fiberglass Insert
      • L.F. Manufacturing Fiberglass Insert
  • Open Cut Utility Repairs (238910)
    • Point Repairs
    • Manhole Install
    • Manhole Riser Install
    • Asphalt Restorations
    • Concrete Restorations
    • Cleanout Install
    • External Lateral Reconnections
  • Material Suppliers (326199)
    • Pre Cast Manholes
    • Manhole Frame & Covers
    • HDPE Pipe & Fittings
    • PVC Pipe & Fittings
    • Cleanout Assembly
  • Traffic Control (561990)
    • Single Lane Closure with Flaggers

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624

Related Posts