PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: Long Quarter North Sewershed Structural Rehabilitation – Contract No. 23002 SX0

Inliner Solutions – ITB: MBE/WBE Certified Firms

Project: Long Quarter North Sewershed Structural Rehabilitation – Contract No. 23002 SX0

Project Location: Baltimore Co., MD

Bid Due Date: 05/14/2024

Quotes Returned: 05/09/2024

Scopes:

·        
CCTV
& Cleaning

o   Pre CIPP CCTV &
Cleaning

o   Removal of protruding Taps

·        
Lateral
Rehabilitation

o   CIPP Spot Repairs

o   Service Lateral CIPP

o   Lateral lining

o   Grouting

o   Air Test Service
connections

·        
Mainline
CIPP Point Repairs

o   8” Spot Repairs

·        
Open
Cut Sewer

o   Point Repairs – Mainline

o   Cleanout installations

o   Lateral replacement

o   Drop connections

o   Raise MH to grade

·        
Manhole
Rehabilitation

o   Cementitious

o   Grout Injection/seal leaks

o   Replace Frame/Cover

o   Rebuild Bench/channel

·        
Manhole
Installation/Replacement

o   Precast

·        
Traffic
Control

o   Flaggers/Signs/Arrow
boards; etc.

·        
Landscaping

o   Seeding and Sodding,
topsoil, supply and/or install of new trees

o   Site Grading (for
restoration purposes)

o   Tree and Brush removal

·        
Asphalt/Pavement
Restoration

o   Alleys, roadways,
sidewalks; etc.

o   Curb Inlet Replacement

o   Pavement Markings

·        
Clearing
& Grubbing

o   Tree Felling

o   Tree Protection

o   Root Pruning

o   Tree protection fence

·        
Erosion/Sediment
Control

o   Silt Fence/Super silt fence

·        
Excavation/Access

o   Select Backfill

o   Temp Access Bridges

o   Stabilized Construction
Entrance

o   Temp Mulch Access Roads

o   Geotextile

·        
Misc.

o   Manhole Abandonment

o   Demo/removal of pipe


Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624