Project: Sanitary Sewer Improvements Hurricane Harvey Floods State Mitigation

PM Construction & Rehab, LLC – ITB: S/M/WBE & Section 3 Certified Firms

Project: Sanitary Sewer Improvements Hurricane Harvey Floods State Mitigation

Project Location: Wallis, TX

Bid Due Date: 05/15/2024

Quotes Returned: 05/10/2024

Scopes:

CCTV (562998)

  • Pre-Clean and CCTV, Post CCTV, 30,208 LF of 6”-12”

Traffic Control (561990)

  • 7 Right turning /Single lane closures on TX Dot roads
  • See attached KMZ file for closure locations
  • Traffic control plans

Open Cut (238910)

  • 12”, 10” and 6” open cut install
  • Trench safety for open cut
  • Manhole install

Manhole rehab (237110)

  • Rehabilitate existing manhole including corrosion protective coating and manhole bench reconstruction, (at 12 locations) / 130VF .
  • *Please reference drawings & specifications*

Supply (326199)

  • 6”-12” HDPE , 30,208 LF , most is ≤ 15VF, refer to page 2 of specs for manhole depths
  • Service reconnections 300 EA
  • Manholes X 86
  • *Please reference drawings & specifications*

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624