PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: Wastewater Collection System Rehabilitation – Cured In Place Pipe Project 2024

PM Construction & Rehab, LLC – ITB: DBE/SEB Certified Firms

Project: Wastewater Collection System Rehabilitation – Cured In Place Pipe Project 2024

Project Location: Lafayette, LA

Bid Due Date: 11/14/2024

Quotes Returned: 11/11/2024

Scopes:

CCTV (562998)

  • Clean 8″ or 10″ Sewer
  • Clean 12″, 15″ or 18″ Sewer
  • Heavy Clean/Corrosion Removal 8″ or 10″ Sewer
  • Heavy Clean/Corrosion Removal 12″, 15″ or 18″ Sewer
  • Root Removal 8″ or 10″ Sewer
  • Root Removal 12″, 15″ or 18″ Sewer
  • Television Inspection of 8″ or 10″ Sewer
  • Television Inspection of 12″, 15″ or 18″ Sewer
  • Additional Setup for Television Inspection
  • Remote Cutting and Brushing of Branch Sewer Service Connections
  • Preparation of Lateral Opening for the CIPP Lining Of Lateral Pipe on existing main lined with CIPP
  • Remote Cutting of protruding tap or obstruction in main line pipe

Bypass (237110)

  • Set-up bypass Pump 8″ to 10″ Sewer
  • Operation of bypass Pump 8″ to 10″ Sewer
  • Set-up bypass Pump 12″, 15″ or 18″ Sewer
  • Operation of bypass Pump 12″, 15″ or 18″ Sewer

Lateral Lining (237110)

  • CIPP Lining of 2′-5′ Of Lateral Pipe
  • CIPP Lining of 5.1′ to 25′ Of Lateral Pipe
  • Additional CIPP Lining beyond 25′ up to 55′ Of Lateral Pipe

Traffic Control (561990)

  • Arrow Board
  • Traffic Control for Sewers During Non-Standard Working Hours

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624