PM Construction & Rehab, LLC – ITB: M/S/WBE & Labor Surplus Certified Firms
Project: GLO CDBG MIT Sewer Improvements
Project Location: Shephard, TX
Bid Due Date: 11/20/2024
Quotes Returned: 11/15/2024
Scopes:
- 6-inch SDR-21 PVC Force Main
- 10-inch SDR-26 PVC Sewer Line
- Replace Existing Manhole
- Construct Drop Connection at Manhole
- Replace Short-Side Service
- Replace Long-Side Service
- 14” Standard Steel Casing at Creek Crossing
- 12” Standard Steel Casing under Highway
- Reset Cast Iron Frame
- Replace Castings with Bolted, Gasketed Cover and Frame
Bypass (237110)
- Bypass setups of lines 8-10”
- Bypass of lift station
CCTV (562998)
- Pre clean and CCTV 8-10”, 39,845 LF
- Post CCTV 39,845 LF
Bore (237110)
- Smooth Bore, CIP
- Bore of service lines
Lift Station (237110)
- SH150 Lift Station Improvements as shown on plans including conversion/rehabilitation of existing wet well.
SUPPLY (326199)(326122)(237120)(331210)(331511)
- 8”, 10” SDR 17 HDPE
- Service connections
- Cleanouts
- Manholes
- 14” Standard Steel Casing
- 12” Standard Steel Casing
- Cast Iron Frame
- Gasketed Cover and Frame
- Manhole Insert (Dish)
- Ram-nek
Specs/Plans /Questions– Ashden Middlebrooks | ashden.middlebrooks@puriscorp.com | 470-503-5624