PM Construction and Rehab, LLC – ITB: Certified SMWBE Firms
Project: 2021 CMOM Package 4 – CIPP SAWS Job No. 22-4530 SAWS Solicitation No. CO-00663
Project Location: San Antonio, Texas
Bid Due Date: 07/12/2023
Quotes Returned: 07/07/2023
Scopes:
- Paving /asphalt/concrete restoration (237310)
- Tack coat
- Remove sidewalks/riprap.
- Install asphalt.
- Install pavement.
- Construction entrances/exits.
- Install concrete trail.
- Flowable fill
- Concrete sidewalks.
- Traffic control (561990)
- Traffic control plans in plans.
- Traffic control required at 7 sites.
- CCTV (562998)
- Per CCTV and cleaning required for 8”-15”, 18”- 24”, 27’ – larger Dia, Approx 7000 LF.
- Specs have some photos of current pipe conditions.
- Obstruction removals.
- Open cut (238910)
- Point repairs 8” – 72”
- Construction entrances/exits.
- Remove and replace fence.
- Install concrete trail.
- Main Break/leak repair
- Temp chain fencing
- Manhole reconstruction.
- Manhole adjustment.
- Bypass (237110)
- Suggested bypass plans in specs.
- Bypass required at 7 sites.
- Manhole Rehab (237110)
- 41VF of manhole rehab required.
- Tree management (561730)
- In accordance with plans and specs
- Tree protection required in several areas.
- Hydro mulch required.
- Topsoil required.
- St Augustine sodding.
- Suppliers (326199)
- 5’ Fiberglass manhole.
Specs/Plans /Questions– Ashden Middlebrooks | ashden.middlebrooks@puriscorp.com | 470-503-5624