PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: 2021 CMOM Package 4 – CIPP SAWS Job No. 22-4530 SAWS Solicitation No. CO-00663

PM Construction and Rehab, LLC – ITB: Certified SMWBE Firms

Project: 2021 CMOM Package 4 – CIPP SAWS Job No. 22-4530 SAWS Solicitation No. CO-00663

Project Location: San Antonio, Texas

Bid Due Date: 07/12/2023

Quotes Returned: 07/07/2023

Scopes:

  • Paving /asphalt/concrete restoration (237310)
    • Tack coat
    • Remove sidewalks/riprap.
    • Install asphalt.
    • Install pavement.
    • Construction entrances/exits.
    • Install concrete trail.
    • Flowable fill
    • Concrete sidewalks.
  • Traffic control (561990)
    • Traffic control plans in plans.
    • Traffic control required at 7 sites.
  • CCTV (562998)
    • Per CCTV and cleaning required for 8”-15”, 18”- 24”, 27’ – larger Dia, Approx 7000 LF.
    • Specs have some photos of current pipe conditions.
    • Obstruction removals.
  • Open cut (238910)
    • Point repairs 8” – 72”
    • Construction entrances/exits.
    • Remove and replace fence.
    • Install concrete trail.
    • Main Break/leak repair
    • Temp chain fencing
    • Manhole reconstruction.
    • Manhole adjustment.
  • Bypass (237110)
    • Suggested bypass plans in specs.
    • Bypass required at 7 sites.
  • Manhole Rehab (237110)
    • 41VF of manhole rehab required.
  • Tree management (561730)
    • In accordance with plans and specs
    • Tree protection required in several areas.
    • Hydro mulch required.
    • Topsoil required.
    • St Augustine sodding.
  • Suppliers (326199)
    • 5’ Fiberglass manhole.

Specs/Plans /Questions– Ashden Middlebrooks | ashden.middlebrooks@puriscorp.com | 470-503-5624

Related Posts