PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: FY 2022 CDBG Sanitary Sewer Rehabilitation

Inliner Solutions, LLC – ITB: Section 3 HUD Certified Firms

Project: FY 2022 CDBG Sanitary Sewer Rehabilitation

Project Location: Baldwin Co., GA

Bid Due Date: 07/25/2023

Quotes Returned: 07/20/2023

Scopes:

  • Pre CIPP CCTV & Cleaning (562998)
    • 8” Dia. San. Sewer
    • Protruding Service Removal
  • Erosion Control (561730)
    • Silt Fence
    • Grassing & Mulching
  • Open Cut utility Repairs (238910)
    • 8” PVC Sewer Install
    • Manhole Install
    • 4 – 6” PVC Service Line install
    • Point Repairs
    • Classified Excavation
    • Cleanout Install
  • Asphalt & Concrete Surface Restoration (237310)
  • Sewer Lateral Rehabilitation (237110)
    • 5’ Sewer Lateral Lining per EA
  • Manhole Rehabilitation (237110)
    • Base Product: Ultra-high build structural-grade reinforced epoxy Lining Material
      • i. 1st Coat – Tnemec Epoxytec CPP trowel-Liner or Epoxytec CPP Sprayliner applied at 1/8” or 125 mils dry.
    • Deduct Alternate Product: 100% solids three component Epoxy Modified Mortar
    • Liner:
      • i. 1st Coat – Tnemec Mortartec Cladliner applied 1/2” to 1”
      • ii. Compressive strength – ASTM C 579 no less than 4,888 psi after seven day cure. Bond Strength – ASTM C 882 no less than 2,040 psi at 28 days.
      • Shrinkage – ASTM C 596 after 1, 7, 14 and 28 days – 0%

Specs/Plans /Questions– Ashden Middlebrooks | ashden.middlebrooks@puriscorp.com | 470-503-5624