Inliner Solutions, LLC – ITB: D/M/WBE & Section 3 Certified Firms
Project: Corner Creek Basin Sewer Rehab (PHASE 3)
Project Location: Honea Path, SC
Bid Due Date: 08/15/2023
Quotes Returned: 08/10/2023
Scopes:
- Pre & Post Pipe Burst CCTV & Cleaning San. Sewer (562998)
- 8” – 16” Dia.
- Manhole Rehabilitation (237110)
- COMPOSITE LINER SYSTEM 1 – Madewell Products Corporation
- COMPOSITE LINER SYSTEM 2 -Raven Lining Systems
- COMPOSITE LINER SYSTEM 3 – Tnemec
- Material Suppliers (326199)
- PVC Pipe & Fittings
- DIP
- HDPE Pipe
- Sewer Saddles
- Pre cast Manholes
- Manhole Frame & Covers
- Asphalt & Concrete Repairs (237310 / 238110)
- Asphalt Patching
- Asphalt Overlay
- Thermoplastic Striping
- Concrete Patching
Specs/Plans /Questions– Ashden Middlebrooks | ashden.middlebrooks@puriscorp.com | 470-503-5624