PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: Multiple Sewershed Package 15 – CIPP SAWS Job No. 23-4507 SAWS Solicitation No. CO-00654

PM Construction and Rehab, LLC – ITB: Certified SMWBE Firms

Project: Multiple Sewershed Package 15 – CIPP SAWS Job No. 23-4507 SAWS Solicitation No. CO-00654

Project Location: San Antonio, Texas

Bid Due Date: 10/17/2023

Quotes Returned: 10/12/2023

Scopes:

Open cut (238910)

  • 36” PVC .
  • 48” FRP.
  • Manhole install/ adjustment.
  • Point repairs 10”-12”.
  • Riprap.

CCTV (562998)

  • Pre- CCTV & Clean Pipes sizes 10” – 66”, 4980 LF, post 121LF.

Manhole / Siphon Rehab (237110)

  • Rehab of manholes , siphons ,  sewer, and diversion structures.

Paving (237310)

  • HOT MIX ASPHALTIC CONCRETE PAVEMENT.
  • PRIME COAT.
  • TACK COAT.
  • Curb
  • Sidewalk
  • Driveway
  • Flexible base.

Landscaping (561730)

  • Tree protection.
  • Bermuda sodding.
  • Hydro mulching.

Traffic Control (561990)

  • Traffic control at 5 sites.

Bypass (237110)

  • Bypass of lines 10”-66” at 5 sites.

Specs/Plans /Questions– Ashden Middlebrooks | ashden.middlebrooks@puriscorp.com | 470-503-5624