Inliner Solutions, LLC – ITB: M/WBE Certified Firms
Project: Contract 14.0 – Bridge Creek and College Park Sanitary Sewer Rehabilitation Project No. CS370924-02
Project Location: Laurinburg, NC
Bid Due Date: 06/06/2023
Quotes Returned: 06/01/2023
Scopes:
- Pre CIPP CCTV & Cleaning (562998)
- 8” – 24” San. Sewer
- Protruding Tap Removal
- Dye Testing
- Open Cut Point Utility Repairs (238910)
- Point Repairs
- Sanitary Sewer Removal & Replacement (PVC & DIP)
- Manhole Drop Connections
- Manhole Removal & Replacement
- Manhole Adjustments
- R&C Replacement
- Lateral Lining (237110)
- CIPP Spot Repairs
- Grouting (238110)
- Pipeline Packer Injection Capital Grouting of Laterals
- Pipeline Packer Injection Capital Grouting of Main Line Joints
- Pipeline Packer Injection Capital Grouting of Annular Space Tap (AST) at Laterals
- Manhole Rehabilitation (237110)
- Install 1” thick cementitious (Condition A) mortar on existing manhole walls and benches
- Rebuilt Invert
- Epoxy Coat Invert
- Chimney Seals
- Concrete & Asphalt Restorations (238110)
- Removal of asphalt pavement and underlayment
- Removal of concrete pavement and underlayment
- Replacement roadway asphalt patch
- Replacement asphalt parking lot, driveway, or sidewalk patch
- Replacement concrete parking lot, driveway, or sidewalk patch
- Replacement concrete curb and gutter
- Replacement asphalt and concrete curb
- Replacement gravel driveway or area
- Erosion Control (561730)
- Silt fence
- Temporary inlet protection
- Wattle
- Matting
- Temporary construction entrance
- Traffic Control (561990)
- Arrow board
- Portable changeable message board
- Drums
Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624