PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: Wastewater Collection System Rehabilitation and Renewal – File No. 4236-10

PM Construction & Rehab, LLC – ITB: D/M/WBE Certified Firms

 

Project: Wastewater Collection System Rehabilitation and Renewal – File No. 4236-10

Project Location: Houston, TX

Bid Due Date: 12/29/2022

Quotes Returned: 12/26/2022


Scopes: 

Sanitary sewer cleaning & CCTV – 562998

  • Cleaning & CCTV Gravity Sewer
    • 6” – 36” Diameter Sewer
  • Siphon Cleaning & Inspection
    • 6” – 48” Diameter Siphon
  • Mechanical Cleaning
    • 6” – 36” Diameter Sewer

 

Traffic control – 561990

  • Flagmen & Certified Flagmen

 

Bypass Pumping for Sanitary Sewer – 237110

  • 6” – 16” setup and pump operation

 

Open Cut Utility Repairs (6” – 48” Diameter) – 238910

  • Hand Excavation Pits
  • Obstruction removal by excavation
  • Sanitary Sewer force Main replacement
  • Sanitary Sewer point repairs
  • Sanitary sewer main remove & Replacement
  • Slurry Boring
  • Air release valve removal & replacement on force main
  • Adjust Manholes
  • Air Release Valve Manhole Install
  • Standard FG manhole install
  • Precast concrete manhole install
  •  

Manhole Rehabilitation – 237110

  • Concrete Liner
  • COH Approved Products
  • Chemical Grout
  • Manhole Bench rehabilitation

 

Concrete & Asphalt repairs – 237310 / 238110

  • Remove & Replace concrete Driveway & Sidewalk
  • Curb & Gutter removal & Replacement
  • ADA Ramp Install
  • Asphalt Patching
  • Asphalt Mill & Overlay
  • Curb
  •  

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624