PM Construction & Rehab, LLC dba IPR South Central – ITB: Certified MBE/WBE Firms
Project: Wastewater Collection System Rehabilitation and Renewal | Project No.: WBS No. R000266-0332-4, File No. 4236-05
Project Location: Houston, TX
Bid Due Date: 11/18/2021
Quotes Returned: 11/15/2021
Scopes Needed:
- Cleaning & CCTV:
- 6”- 48” Gravity Sewers
- Force Mains & Siphons
- Traffic Control
- Sanitary Sewer Bypass Pumping
- Static & Pneumatic Pipe Bursting
- Material Suppliers:
- 6”-18” HDPE Piping
- Pre-cast Manholes
- Slip-Lining
- Grouting:
- Grouting for the annular space for the slip-lined mains
- Chemical grouting of the manholes
- Manhole Rehabilitation:
- City of Houston Wastewater Approved Products
- Open Cut Utility Repairs:
- Well Pointing/Dewatering System
- Trench Safety System
- Special excavation by hand
- Obstruction Removal by Excavation
- Remove & Replace Sanitary sewer mains
- Point Repairs by excavation
- Abandonment of point repairs
- Slurry Boring
- Service Reconnect by Excavation
- Cement Stabilized Sand Backfill
- Install Sanitary Sewer Cleanouts
- Remove & Replace Air Release Valves
- Adjust/Reset Manhole Frame & Cover
- Raise Manhole to Grade
- Install Air release valve manholes
- Remove & Replace/ Install New Manholes/ Fiberglass Manholes
- Landscaping:
- Remove & Replace Trees
- Surface Restorations
- Concrete & Asphalt Restorations
Specs/Plans /Questions– Crystal Galvan | [email protected] | 678-436-6814