IPR Southeast, LLC – ITB: HUD Section 3 Certified Firms
Project: Smith Barnes Sewer Basin Rehabilitation – Phase II | ITB NO: 2021-0012
Project Location: Stockbridge, GA
Bid Due Date: 12/02/2021
Quotes Returned: 11/29/2021
Scopes Needed:
- Pre CCTV/Clean
- 8500 LF of 8” CIPP
- Manhole Rehabilitation
- 300 VF of Cementitious Liner (SewperCoat, Strong Seal, or approved equal)
- 25 EA- Manhole Invert Reconstruction
- Removal and installation of new frame and cover
- Open Cut
- 10 ea Adjust manhole to grade
- 5 ea Raise manhole 2 vertical feet
- 25 ea Sanitary Sewer Point Repairs
- Additional Footage for Point repairs
- 3750 LF of 6” C900 Sanitary Sewer Force Main Install
- 100 LF of 6” Ductile Iron Sanitary Sewer Force Main
- 6” Dia. Force Main Aerial Creek Crossing
- 250 LF of Jack & Bore 16” Dia. Steel Casing
- 100 LF of 16” Steel Casing under ditches
- 100 SY of 4” Thick Class A Concrete
- 300 SY of GDOT Class A Pavement Replacement
- 100 SY of GDOT 6” Thick Class A Concrete
- 5000 LF of Type S Silt Fence
- 2 EA Construction Entrance- Install, Maintain, and Remove
- 2 AC GDOT Permanent Grassing
- 100 Ton GDOT TYPE 3 Rip Rap
- 1 Ea Construction Sign
- Traffic Control
- Signs, Cones, Flaggers
Specs/Plans/Questions– Crystal Galvan | [email protected] | 678-436-6814