PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project Owner: City of Gray

IPR Southeast, LLC – ITB: Certified DBE/MBE/WBE Firms

Approved Certification Agencies: Georgia DOT | Environmental Protection Agency | U.S. Small Business Administration| Or by state, local, Tribal, or private entities whose certification criteria match EPA criteria

Project Owner: City of Gray

Project Title: Sanitary Sewer Rehabilitation, Phase I

Bid Date: 3/01/22

Quotes Returned: 2/24/22 – 4:00 P.M.EST


Scopes:

Erosion Control
• Silt Fence – NS
• Construction Exit
• Grassing & Mulching
• Clearing and Grubbing
Clean/CCTV
• 6554 LF Pre-Clean/CCTV
• 6554 LF Post-Clean/CCTV
• 2500 LF heavy Cleaning
• Chemical treatment of roots (not a pay item)
Manhole Rehab
• Rehab Manhole with Cementitious Liner – Calcium-aluminate cement
o Alternate Product: Tnemec
Infiltration Control,
o Alternate Product: Prime Resin 900 XLV or equal
• Vacuum Sewer testing on manholes
• Reconstruct Manhole Invert
o Invert Repair or patching, Alternate Product: Tnemec Series 217 or 218
Open Cut
• Replace Manhole Ring and Cover
• Sanitary sewer point repair
• Trench Stabilization
• Standard Manhole Construction
• Standard Manhole Construction Ring and Cover
• Soil compaction testing
Supplier
• Inserta Tee Saddles
• HDPE IPS SDR-17
• Full circle pipe repair clamp at terminals
Traffic Control
• Signs, cones, flaggers, arrow boards.


Specs/Plans – Jennifer Elder | [email protected] | 404-927-4603

Related Posts