PM Construction & Rehab, LLC dba IPR South Central – ITB: OBO certified M/W/SBE firms
Project: FY2022 Drainage Rehab (SWAT) Work Orders #3 – Houston, TX
Bid Date: 03/03/2022
Quotes Returned: 03/01/2022 – 5:00 P.M. EST
Scopes:
* Please note this is a work order bid – Please return the items you are bidding and either a price or a factor of the price listed on the bid form.
Scopes:
Traffic Control
- Flaggers
- Traffic Control Through Major Throughfares
- Traffic Control within Local Streets
- Concrete Barriers
- Traffic Signs
Landscape
- Chain Link Fencing
- Wooden Fencing
- Wrought Iron Fencing
- Pruning
- Mowing
- Clearing and Grubbing
- Herbicide
- Tree Removal
- Sodding
Erosion Control
- Tree Planting
- Sandbag Barrier
- Straw Barrier
- Sediment Traps
- Reinforced Fabric Barrier
- SWPP
- Sediment Basin
- Topsoil
- Hydromulch
Concrete/Asphalt
- Remove and Dispose of existing concrete curb
- Remove and Dispose of Asphaltic surface
- Milling of Asphalt
- Removal of concrete pavements
- Removal of Misc. Concrete and Masonry
- Saw Cutting of Concrete or Asphalt
- Concrete Paving Header
- Cement Sand
- Flexible Base Course
- Pavement Repair
- Reinforced Concrete Pavement varying thickness
- Hot Mix Asphalt
- Install Gravel Driveway
- Concrete Curb
- Pavement Markings
Open Cut
- Trench Safety
- Manhole Removal
- Removal of Storm Sewers
- Grout fill and abandon manholes
- Adjusting inlets to new grade
- Removal of storm culverts
- Grout fill and abandon storm sewers
- Manhole Installations
- Junction Boxes
- Storm Sewer Install by Open Cut (18-96 Inch)
- Sewer Install by Augering
- Point Repairs
- Site Restoration
- 18” Storm Sewer By Open Cut
- 24” Storm Sewer By Open Cut
- 30” Storm Sewer By Open Cut
- 36” Storm Sewer By Open Cut
- 42” Storm Sewer By Open Cut
- 48” Storm Sewer By Open Cut
- 54” Storm Sewer By Open Cut
- 60” Storm Sewer By Open Cut
- 72” Storm Sewer By Open Cut
- 84” Storm Sewer By Open Cut
- 90” Storm Sewer By Open Cut
- 96” Storm Sewer By Open Cut
- Misc Excavation
- Granular Fill
- Ductile Iron Fittings
- Machine Excavation
- Hand Excavation
- Type E Inlet
- Sliplining up to 120” Storm Sewers
Manhole Rehabilitation
- Sewpercoat, Mainstay, Dinjer
CCTV/Clean
- Television Inspection of Storm Sewers All Diameters, All Depths
- Cleaning of existing Culverts
- Cleaning of Storm Sewer 8”to 96” dia.
Debris Removal / Hauling
Specs/Plans /Questions– Crystal Galvan | [email protected] | 678-436-6814