Project: Sanitary Sewer Pipe Bursting Phase 2

PM Construction & Rehab, LLC dba IPR South Central – ITB: HUD Section 3 Firms

Project: Sanitary Sewer Pipe Bursting Phase 2

Project Location: Hitchcock, TX

Bid Due Date: 3/30/2022

Quotes Returned: 3/28/2022


Scopes:

  • Pre & Post  Sanitary Sewer  Pipe Burst CCTV & Cleaning
    • 8,10,12 & 16 – Inch Diameter
  • Manhole Rehabilitation
    • Approved Product : Spectrashield
  • Open Cut Utility Repairs
    • Mainline Point Repairs
    • Manhole Removal & Replacement
    • Mainline Cleanout Removal & Replacement
    • Manhole Ring & Cover Removal & Replacement
  • Landscape
    • Solid Sod St. Augustine Install and watering until Vegetation Establishment (400 SY total)
  • Material Suppliers
    • HDPE Pipe
      • 8,10,12 & 16” IPS DR 19 HDPE
    • PVC Pipe
    • Stainless steel strap Fernco Lateral reconnection saddles
    • PVC Cleanout assembly
    • Precast manhole structures (With required epoxy lining)

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624 