PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: Wastewater Treatment Plant A Basin A-08 Rehabilitation

PM Construction & Rehab, LLC – ITB: DSBE Certified Firms

Project: Wastewater Treatment Plant A Basin A-08 Rehabilitation

Project Location: Lake Charles, LA

Bid Due Date: 07/19/2022

Quotes Returned: 07/15/2022


Scopes:

  • Pre & Post Pipe Burst CCTV & Cleaning , San. Sewer
    • 8” Dai. – 18,913 LF
  • Manhole Rehabilitation
    • 430 VF
    • SpectraShield as manufactured by CCI Spectrum, Inc., Triple Shield as manufactured by Triple M Concrete Products, Inc., or approved equal.
  • Open Cut Utility Repairs
    • Furnish and Install New Precast Manhole 0’‐6′ Deep
    • Remove, Dispose Of, and Replace Existing Storm Drain Pipe
    • Adjust Existing Water Meters, Valves, and Service Lines
    • Point Repair (0.0’ – 6.0’ Deep) For Existing 6 Inch w/ New 6 Inch SDR26 PVC Pipe
    • Point Repair (6.1’ – 10.0’ Deep) For Existing 6 Inch w/ New 6 Inch SDR26 PVC Pipe
    • Point Repair (0.0’ – 6.0’ Deep) For Existing 8 Inch w/ New 8 Inch SDR26 PVC Pipe
    • Point Repair (6.1’ – 10.0’ Deep) For Existing 8 Inch w/ New 8 Inch SDR26 PVC Pipe
    • Point Repair (6.1’ – 10.0’ Deep) For Existing 12 Inch w/ New 12 Inch SDR26 PVC Pipe
    • Point Repair (6.1’ – 10.0’ Deep) For Existing 24 Inch w/ New 24 Inch SDR26 PVC Pipe
    • Furnish and Install New 8″ SDR26 Restrained Joint PVC For Open Cut Replacement of Existing 8” Sewer Including Removal and Disposal of Existing Pipe
  • Material Suppliers
    • 12” DR 17 HDPE
    • 8” DR 17 HDPE
    • 6” DR 17 HDPE
    • Sewer saddles
      • Flexible Tap Saddles, as manufactured by Fernco Systems, T-Flex Sewer Saddles, as manufactured by Mission Rubber Company, or approved equal
    • 8” SDR 26 PVC Pipe & Fittings
    • 6” SDR 26 PVC Pipe & Fittings
    • Precast Concrete Manholes
    • Manhole Frame & Covers
    • #610 Limestone , Delivered
    • Geotextile Fabric]
  • Concrete
    • Furnish and Install 4″ Thick Reinforced PCC Pavement For Sidewalk Replacement
    • Furnish and Install 6″ Thick Reinforced PCC Pavement For Driveway Replacement
    • Furnish and Install 8″ Thick Reinforced PCC Pavement For Roadway Replacement
  • Asphalt
    • Furnish and Install 4″ Asphalt Pavement For Roadway Replacement
  • Traffic Control
    • Turkey setup & operation of single lane closure with flaggers, 12 HR shift

 


Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624 