PM Construction & Rehab, LLC – ITB: Certified MBE/WBE Firms
Project: Wastewater Collection System Rehabilitation and Renewal | Project No.: WBS No. R000266-0350-4, File No. 4236-08
Project Location: Houston, TX
Bid Due Date: 9/22/2022
Quotes Returned: 9/19/2022
Scopes:
- Sanitary sewer cleaning & CCTV
- Cleaning & CCTV Gravity Sewer
- 6” – 36” Diameter Sewer
- Siphon Cleaning & Inspection
- 6” – 48” Diameter Siphon
- Mechanical Cleaning
- 6” – 36” Diameter Sewer
- Cleaning & CCTV Gravity Sewer
- Traffic control
- Flagmen & Certified Flagmen
- Bypass Pumping for Sanitary Sewer
- 6” – 16” setup and pump operation
- Open Cut Utility Repairs (6” – 48” Diameter)
- Hand Excavation Pits
- Obstruction removal by excavation
- Sanitary Sewer force Main replacement
- Sanitary Sewer point repairs
- Sanitary sewer main remove & Replacement
- Slurry Boring
- Air release valve removal & replacement on force main
- Adjust Manholes
- Air Release Valve Manhole Install
- Standard FG manhole Install
- Precast concrete manhole Install
- Manhole Rehabilitation
- Concrete Liner
- COH Approved Products
- Chemical Grout
- Manhole Bench rehabilitation
- Concrete Liner
- Concrete & Asphalt repairs
- Remove & Replace concrete Driveway & Sidewalk
- Curb & Gutter removal & Replacement
- ADA Ramp Install
- Asphalt Patching
- Asphalt Mill & Overlay
- Curb
Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624