Project: Wastewater Collection System Rehabilitation and Renewal – 4259-28

PM Construction & Rehab, LLC – ITB: Certified MBE/WBE Firms

Project: Wastewater Collection System Rehabilitation and Renewal – 4259-28

Project Location: Houston, TX

Bid Due Date: 10/06/2022

Quotes Returned: 10/03/2022


Scopes:

  • Clean/CCTV-6”-48” Gravity Sewers, Force mains & Siphons
  • Traffic Control- Flaggers, Lane Closures, Std. Signs & Cones.
  • Bypass- Pumps & Piping per the bid form
  • Static & Pneumatic Pipe Bursting
  • Material – 6”-18” HDPE Piping; Pre-cast Manholes
  • Slip-Lining
  • Grouting
    • Grouting for the annular space for the slip-lined mains
    • Chemical grouting of the manholes
  • Manhole Rehabilitation by 1” thick concrete liner-City of Houston Wastewater Approved Products List
  • Open Cut Work
    • Well Pointing/Dewatering System
    • Trench Safety System
    • Special excavation by hand
    • Obstruction Removal by Excavation
    • Remove & Replace Sanitary sewer mains
    • Point Repairs by excavation
    • Abandonment of point repairs
    • Slurry Boring
    • Service Reconnect by Excavation
    • Cement Stabilized Sand Backfill
    • Install Sanitary Sewer Cleanouts
    • Remove & Replace Air Release Valves
    • Adjust/Reset Manhole Frame & Cover
    • Raise Manhole to Grade
    • Install Air release valve manholes
    • Remove & Replace/ Install New Manholes/ Fiberglass Manholes
    • Remove & Replace Sidewalks/ Pavement/ Driveways/ Curb & Gutter/ Ramps
    • Milling & Overlay
    • Remove & Replace Trees

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624