PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: WASTEWATER COLLECTION SYSTEM REHABILITATION – CURED IN PLACE PIPE PROJECT 2022

PM Construction & Rehab, LLC – ITB: Certified MBE/WBE Firms

Project: WASTEWATER COLLECTION SYSTEM REHABILITATION – CURED IN PLACE PIPE PROJECT 2022

Project Location: Lafayette, LA

Bid Due Date: 10/6/2022

Quotes Returned: 10/3/2022


Scopes:

  • CCTV & Cleaning (562998)
    • Pre CIPP CCTV & Cleaning San. Sewer , 8 – 15 Inch Dia.
    • Root Removal
    • Additional setup for CCTV Inspection
  • Traffic Control (561990)
    • Arrow Board Rental
    • Turnkey Single lane closure setup and operation w/ Flaggers , 12 HR Shift
  • Lateral Rehabilitation (237110)
    • Lateral CIPP Lining, 2’ – 5’ Per lateral

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624

Related Posts