Project: Sanitary Sewer Rehabilitation by Cured-In-Place Pipe Method – 4258-84

PM Construction & Rehab, LLC – ITB: Certified D/M/WBE firms

 

Project: Sanitary Sewer Rehabilitation by Cured-In-Place Pipe Method – 4258-84

Project Location: Houston, TX

Bid Due Date: 10/17/2022

Quotes Returned: 10/20/2022


Scopes:

    • CCTV/Cleaning (562998)

    Cleaning of Sewers 30” – 72”

    Cleaning of Siphons 8” – 48”

    Debris Collection, Removal and Disposal

    TV Inspection 30” – 72”

    TV Inspection with Dye

    TV Inspection of Siphon 12” – 48”

    Obstruction Removal by Remote method

    • Traffic Control (561990)

    Uniformed peace officer

    Non uniformed peace officer

    • Supplier (326199)

    Precast manholes 4’ and 5’ diameter

    Fiberglass 4’ and 5’ diameter

    HDPE Pipe for Bursting

    PVC pipe for point repairs and lateral reconnect (lateral and cleanouts included)

    • Manhole Rehab (237110)

    1” thick concrete liners

    Rehab manhole Bench and Inverts

    Chemical Grouting of manholes

    Grouting setup for manholes


Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624