PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: Sprague Street Neighborhood Sewer Rehab

Inliner Solutions, LLC – ITB: MBE/WBE Certified Firms

Project: Sprague Street Neighborhood Sewer Rehab

Project Location: Winston Salem, NC

Bid Due Date: 03/14/2023

Quotes Returned: 03/09/2023

Scopes:

 CCTV & Cleaning

  • Pre CIPP CCTV & Cleaning
  • 8” Dia. San. Sewer
  • Pre & Post Pipe Burst CCTV & Cleaning
  • 6” through 12” Dia. San. Sewer
  • Protruding Tap Removal

Lateral CCTV Inspection

  • Lateral Testing
  • Lateral Rehabilitation
  • CIPP Spot Repairs
  • Service Lateral CIPP
  • Lateral Connection Seal
  • Lateral CCTV Inspection
  • Lateral Testing

Manhole Rehabilitation

  • 1,205 VF
  1. Cementitious liner:
  2. SewperCoat, by LaFarge Aluminates.
  3. High Performance Mix, by StrongSeal Systems.
  4. Cemtec Silatec CAM, by A.W. Cook Cement, Inc.
  5. Permaform, by AP/M.
  6. Approved equal.
  • Grout Injection

Waterline Open Cut Utility Repairs

  • 3/4″  Service Replacement (short side)
  • 3/4″ Service Replacement (long side)
  • 3/4″ Type “K” Copper Replacement (length beyond meter)
  • 1″  Service Replacement (short side)
  • 1″ Service Replacement (long side)
  • 1″ Type “K” Copper Replacement (length beyond meter)
  • Replace 5/8″ – 3/4″ Meter Setter
  • Replace 1″ Meter Setter
  • Remove and Replace Residential Meter Box
  • Remove and Replace Commercial Meter Box

Traffic Control

  • Trunkey setup and operation of Single lane Closure with Flaggers , 12 HR Shift

Material Suppliers

  • HDPE Pipe & Fittings
  • PVC Pipe & Fittings
  • CMP Pipe
  • DIP
  • Precast Manholes

Specs/Plans/Questions – Ashden Middlebrooks | ashden.middlebrooks@puriscorp.com | 470-503-5624