PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: Wastewater Collection System Rehabilitation and Renewal – File No. 4236-11

PM Construction & Rehab, LLC – ITB: D/M/WBE Certified Firms

Project: Wastewater Collection System Rehabilitation and Renewal – File No. 4236-11

Project Location: Houston, TX

Bid Due Date: 06/29/2023

Quotes Returned: 06/26/2023

Scopes:

  • Sanitary sewer cleaning & CCTV – 562998

Cleaning & CCTV Gravity Sewer

6” – 36” Diameter Sewer

Siphon Cleaning & Inspection

6” – 48” Diameter Siphon

Mechanical Cleaning

6” – 36” Diameter Sewer

  • Traffic control – 561990

Flagmen & Certified Flagmen

  • Bypass Pumping for Sanitary Sewer – 237110

6” – 16” setup and pump operation

  • Open Cut Utility Repairs (6” – 48” Diameter) – 238910

Hand Excavation Pits

Obstruction removal by excavation

Sanitary Sewer force Main replacement

Sanitary Sewer point repairs

Sanitary sewer main remove & Replacement

Slurry Boring

Air release valve removal & replacement on force main

Adjust Manholes

Air Release Valve Manhole Install

Standard FG manhole install

Precast concrete manhole install

  • Manhole Rehabilitation – 237110

Concrete Liner

COH Approved Products

Chemical Grout

Manhole Bench rehabilitation

  • Concrete & Asphalt repairs – 237310 / 238110

Remove & Replace concrete Driveway & Sidewalk

Curb & Gutter removal & Replacement

ADA Ramp Install

Asphalt Patching

Asphalt Mill & Overlay

Curb


Specs/Plans /Questions– Ashden Middlebrooks | ashden.middlebrooks@puriscorp.com | 470-503-5624