PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: ARPA Sewer Improvements

Inliner Solutions, LLC – ITB: M/W/SBE Certified Firms

Project: ARPA Sewer Improvements

Project Location: Adairsville, GA

Bid Due Date: 07/06/2023

Quotes Returned: 07/03/2023

Scopes:

  • Pre & Post Pipe Burst CCTV & Cleaning (562998)
  • Open Cut Utility Repairs (238910)
    • Sewer Removal & Replacement
    • Manhole removal & Replacement
    • Manhole F&C Replacement
  • Asphalt & Concrete Restorations  (237310)
  • Sanitary Sewer Lift Station Upgrades (237110)
  • Manhole Rehabilitation (237110)
    • The 100 percent solids, solvent-free ultra high-build epoxy system shall exhibit the following characteristics:
      • a. Application Temperature – 50 degrees F, minimum
      • b. Thickness – 125 mils minimum
      • c. Color – White, Light Blue, or Beige
      • d. Compressive Strength (per ASTM D695) – 8,800 psi minimum
      • e. Tensile Strength (per ASTM D638) – 7,500 psi minimum
      • f. Hardness, Shore D (per ASTM D4541) – 70 minimum
      • g. Abrasion Resistance (per ASTM D4060 CS 17F Wheel) – 80 mg loss maximum
      • h. Flexural Modulus (per ASTM D790) – 400,000 psi minimum
      • i. Flexural Strength (per ASTM D790) – 12,000 psi minimum
      • j. Adhesion to Concrete, mode of failure (ASTM D4541): Substrate (concrete) failure
      • k. Chemical Resistance (ASTM D543/G20) all types of service for:
        • 1) Municipal sanitary sewer environment
        • 2) Sulfuric acid, 30 percent
        • 3) Sodium hydroxide, 5 percent
  • Material Suppliers (326199)
    • PVC Pipe & Fittings
    • HDPE Pipe & fittings
    • Sewer Saddle for lateral reconnects
    • Manhole Precast structures
    • Manhole Ring & Covers
  • Traffic Control (561990)
    • Single Lane Closure with Flaggers , 12 HR Shift

Specs/Plans /Questions– Ashden Middlebrooks | ashden.middlebrooks@puriscorp.com | 470-503-5624

Related Posts