Inliner Solutions, LLC – ITB: Section 3 HUD Certified Firms
Project: FY 2022 CDBG Sanitary Sewer Rehabilitation
Project Location: Baldwin Co., GA
Bid Due Date: 07/25/2023
Quotes Returned: 07/20/2023
Scopes:
- Pre CIPP CCTV & Cleaning (562998)
- 8” Dia. San. Sewer
- Protruding Service Removal
- Erosion Control (561730)
- Silt Fence
- Grassing & Mulching
- Open Cut utility Repairs (238910)
- 8” PVC Sewer Install
- Manhole Install
- 4 – 6” PVC Service Line install
- Point Repairs
- Classified Excavation
- Cleanout Install
- Asphalt & Concrete Surface Restoration (237310)
- Sewer Lateral Rehabilitation (237110)
- 5’ Sewer Lateral Lining per EA
- Manhole Rehabilitation (237110)
- Base Product: Ultra-high build structural-grade reinforced epoxy Lining Material
- i. 1st Coat – Tnemec Epoxytec CPP trowel-Liner or Epoxytec CPP Sprayliner applied at 1/8” or 125 mils dry.
- Deduct Alternate Product: 100% solids three component Epoxy Modified Mortar
- Liner:
- i. 1st Coat – Tnemec Mortartec Cladliner applied 1/2” to 1”
- ii. Compressive strength – ASTM C 579 no less than 4,888 psi after seven day cure. Bond Strength – ASTM C 882 no less than 2,040 psi at 28 days.
- Shrinkage – ASTM C 596 after 1, 7, 14 and 28 days – 0%
- Base Product: Ultra-high build structural-grade reinforced epoxy Lining Material
Specs/Plans /Questions– Ashden Middlebrooks | ashden.middlebrooks@puriscorp.com | 470-503-5624