Inliner Solutions – ITB: Section 3 Certified Firms
Project: Sewer Improvements FY2022 CDBG
Project Location: Monroe, GA
Bid Due Date: 10/20/2023
Quotes Returned: 10/17/2023
Scopes:
- Pre & Post Pipe Burst CCTV & cleaning (562998)
- 6” Dia. Pre CCTV, 8” Dia. Post CCTV – 3,709 LF
- Material Suppliers (326199)
- HDPE Pipe & Fittings
- Sewer Saddles for Lateral reconnection
- PVC Pipe & Fittings
- Cleanout Assembly
- Pre cast concrete Manholes
- Manhole Rehabilitation (237110)
- Epoxy – Modified Cement Liner (Base Bid)
- Calcium Aluminate Cement Liner (Alternate to Base Bid)
- Epoxy Coating (Alternate to Base Bid)
- Asphalt Restoration (237310)
- 1.5” Mill & Overlay
- Thermoplastic Striping
- Traffic Control (561990)
- Single Lane closure with Flaggers, 12 HR shift
Specs/Plans /Questions– Ashden Middlebrooks | ashden.middlebrooks@puriscorp.com | 470-503-5624