PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: GLO CDBG MIT Sewer Improvements

PM Construction & Rehab, LLC – ITB: M/S/WBE & Labor Surplus Certified Firms

Project: GLO CDBG MIT Sewer Improvements

Project Location: Shephard, TX

Bid Due Date: 11/20/2024

Quotes Returned: 11/15/2024

Scopes:

Open Cut (238910)

  • 6-inch SDR-21 PVC Force Main
  • 10-inch SDR-26 PVC Sewer Line
  • Replace Existing Manhole
  • Construct Drop Connection at Manhole
  • Replace Short-Side Service
  • Replace Long-Side Service
  • 14” Standard Steel Casing at Creek Crossing
  • 12” Standard Steel Casing under Highway
  • Reset Cast Iron Frame
  • Replace Castings with Bolted, Gasketed Cover and Frame

Bypass (237110)

  • Bypass setups of lines 8-10”
  • Bypass of lift station

CCTV (562998)

  • Pre clean and CCTV 8-10”, 39,845 LF
  • Post CCTV 39,845 LF

Bore (237110)

  • Smooth Bore, CIP
  • Bore of service lines

Lift Station (237110)

  • SH150 Lift Station Improvements as shown on plans including conversion/rehabilitation of existing wet well.

SUPPLY (326199)(326122)(237120)(331210)(331511)

  • 8”, 10” SDR 17 HDPE
  • Service connections
  • Cleanouts
  • Manholes
  • 14” Standard Steel Casing
  • 12” Standard Steel Casing
  • Cast Iron Frame
  • Gasketed Cover and Frame
  • Manhole Insert (Dish)
  • Ram-nek

Specs/Plans /Questions– Ashden Middlebrooks | ashden.middlebrooks@puriscorp.com | 470-503-5624