Inliner Solutions – ITB: D/M/WBE Certified Firms
Project: 2024 CMP Lining Project
Project Location: Tuscaloosa, AL
Bid Due Date: 12/10/2024
Quotes Returned: 12/05/2024
Scopes:
- Pre CIPP CCTV & Cleaning (562998)
- 18 & 24 Inch Storm Sewer
- Open Cut / Utility Repairs (238910)
- Sidewalk Replacement
- Handicap Remp install – Remove existing disconnected clay sewer line from Storm system, including excavation & backfill
Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624