Project: 2022 CWSRF Sanitary Sewer Rehabilitation & Replacement

Inliner Solutions – ITB: M/WBE Certified Firms

Project: 2022 CWSRF Sanitary Sewer Rehabilitation & Replacement

Project Location: – Camp Hill, AL

Bid Due Date: 03/13/2025

Quotes Returned: 03/10/2025

Scopes:

Heavy Cleaning, Pre- and Post-CCTV

Traffic Control

Open Cut

  • 6”-15” Diameter Point Repairs
  • 6”-15” Diameter Sag Repairs

Manhole Rehab

  • Pre-Construction Manhole Inspection w/ Report
  • Locate/Excavate Manhole(s)
  • Manhole Height Adjustment (Including Ring & Cover Reset)
  • 48” Diameter Ring & Cover
  • Remove & Dispose of Existing Manhole
  • Connect to Existing Manholes

Landscape/ Erosion Control

  • Clearing & Grubbing
  • Cleanup, Seeding, Mulching & Restoration
  • Supplying of erosion control materials, including but not limited to silt fence, slope fabric, aggregates, silt savers, etc.
  • Installation of erosion control materials, including but not limited to silt fence, slope fabric, aggregates, silt savers, etc.

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624