PM Construction and Rehab, LLC – ITB: Certified SMWBE Firms
Project: 2022 Inflow Reduction Package 1 & 2021 CMOM Package 3B
Project Location: San Antonio, Texas
Bid Due Date:
Inflow Reduction: 04/29/2025
2021 CMOM: 04/30/2025
Quotes Returned: 04/24/2025
Scopes:
2022 Inflow Reduction Package
- CCTV
- Landscaping
- Manhole Rehab
- Open Cut
- Paving
- Striping
- Traffic Control
2021 CMOM Package 3B
- Bypass
- CCTV
- Landscaping
- Manhole Rehab
- Siphon Rehab
- Open Cut
- Paving
- Traffic Control
Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624