PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: 2022 Inflow Reduction Package 1 & 2021 CMOM Package 3B

PM Construction and Rehab, LLC – ITB: Certified SMWBE Firms

Project: 2022 Inflow Reduction Package 1 & 2021 CMOM Package 3B

Project Location: San Antonio, Texas

Bid Due Date:

                Inflow Reduction: 04/29/2025

                2021 CMOM: 04/30/2025

Quotes Returned: 04/24/2025

Scopes:

2022 Inflow Reduction Package                                                   

  • CCTV                                                                                                                  
  • Landscaping
  • Manhole Rehab
  • Open Cut
  • Paving
  • Striping
  • Traffic Control

2021 CMOM Package 3B

  • Bypass
  • CCTV
  • Landscaping
  • Manhole Rehab
  • Siphon Rehab
  • Open Cut
  • Paving
  • Traffic Control

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624

Related Posts