PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: CTO 113 Suitland Road Sewer Rehabilitation & CTO 111 Derwood Road Sewer Rehabilitation

Inliner Solutions, LLC – ITB: MBE/W/SLBE-SDV Certified Firms

Projects: CTO 113 Suitland Road Sewer Rehabilitation

  CTO 111 Derwood Road Sewer Rehabilitation

Project Location: WSSC

Bid Due Date: Suitland Road – May 6th, 2025

                          Derwood Road – May 8th, 2025

Quotes Returned: Suitland Road – May 1st, 2025

     Derwood Road – May 5th, 2025

Scopes:

Suitland Road

  • Dig 
  • Point Repair
  • Pipe Bursting
  • Heavy Cleaning & CCTV
  • Traffic control
  • Laterals (Sewer House Connection) /
  • Manhole Frame & Cover, Ring Adjustment (Structural)
  • Manhole lining Cementitious / Epoxy
  • Road / Highway restoration
  • Concrete Curb & Driveway
  • Landscape / tree removal / Pruning
  • Borrow / GAB / Gravel

Derwood Road

  • Dig 
  • Point / Spot Repair
  • Heavy Cleaning & CCTV
  • Traffic control
  • Pipe Bursting
  • Laterals (Sewer House Connection) / Lateral Lining
  • Manhole Frame & Cover, Ring Adjustment (Structural)
  • Manhole lining Cementitious
  • Road / Highway restoration / Milling
  • Concrete Curb & Driveway
  • Landscape / tree removal / Pruning
  • Borrow / GAB / Gravel /
  • Bypass

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624

Related Posts