Inliner Solutions, LLC – ITB: MBE/W/SLBE-SDV Certified Firms
Projects: CTO 113 Suitland Road Sewer Rehabilitation
CTO 111 Derwood Road Sewer Rehabilitation
Project Location: WSSC
Bid Due Date: Suitland Road – May 6th, 2025
Derwood Road – May 8th, 2025
Quotes Returned: Suitland Road – May 1st, 2025
Derwood Road – May 5th, 2025
Scopes:
Suitland Road
- Dig
- Point Repair
- Pipe Bursting
- Heavy Cleaning & CCTV
- Traffic control
- Laterals (Sewer House Connection) /
- Manhole Frame & Cover, Ring Adjustment (Structural)
- Manhole lining Cementitious / Epoxy
- Road / Highway restoration
- Concrete Curb & Driveway
- Landscape / tree removal / Pruning
- Borrow / GAB / Gravel
Derwood Road
- Dig
- Point / Spot Repair
- Heavy Cleaning & CCTV
- Traffic control
- Pipe Bursting
- Laterals (Sewer House Connection) / Lateral Lining
- Manhole Frame & Cover, Ring Adjustment (Structural)
- Manhole lining Cementitious
- Road / Highway restoration / Milling
- Concrete Curb & Driveway
- Landscape / tree removal / Pruning
- Borrow / GAB / Gravel /
- Bypass
Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624