PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: CTO 106 Hyattsville Sewer Rehabilitation, CTO 109 District Heights Rd, & CTO 108 Laurel Sewer Rehabilitation

Inliner Solutions, LLC – ITB: MBE/W/SLBE-SDV Certified Firms

Projects: CTO 106 Hyattsville Sewer Rehabilitation

   CTO 109 District Heights Rd

   CTO 108 Laurel Sewer Rehabilitation

Project Location: WSSC

Bid Due Date: Hyattsville Sewer – May 13th, 2025

                          District Heights – May 20th, 2025

                          Laurel Sewer – May 22nd, 2025

Quotes Returned: Hyattsville Sewer – May 8th, 2025

     District Heights – May 15th, 2025

     Laurel Sewer – May 19th, 2025

Scopes:

Hyattsville Sewer

  • Dig 
  • Point Repair
  • Heavy Cleaning & CCTV
  • Pipe Bursting
  • Traffic control
  • Laterals (Sewer House Connection) / Lateral Lining
  • Manhole Frame & Cover, Ring Adjustment (Structural)
  • Manhole lining Cementitious
  • Road / Highway restoration
  • Concrete Curb & Driveway
  • Landscape / tree removal / Pruning
  • Borrow / GAB / Gravel / Pole Bracing

District Heights

  • Dig 
  • Point Repair
  • Heavy Cleaning & CCTV
  • Pipe Bursting
  • Traffic control
  • Laterals (Sewer House Connection) / Lateral Lining
  • Manhole Frame & Cover, Ring Adjustment (Structural)
  • Manhole lining Cementitious
  • Road / Highway restoration
  • Concrete Curb & Driveway
  • Landscape / tree removal / Pruning
  • Borrow / GAB / Gravel / Pole Bracing

Laurel Sewer

  • Dig 
  • Point Repair
  • Heavy Cleaning & CCTV
  • Traffic control
  • Manhole Frame & Cover, Ring Adjustment (Structural)
  • Manhole lining Cementitious
  • Road / Highway restoration
  • Concrete Curb & Driveway
  • Landscape / tree removal / Pruning
  • Borrow / GAB / Gravel / Pole Bracing

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624