PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: Sanitary Sewer Rehabilitation Phase 2

Inliner Solutions – ITB: S/M/W & Labor Surplus Certified Firms

Project: Sanitary Sewer Rehabilitation Phase 2

Project Location: Cordele., GA

Bid Due Date: 05/22/2025

Quotes Returned: 05/19/2025

Scopes:

  • CCTV/Cleaning
    • 8″ Sewer Cleaning and Televise Sewer Line (Pre-Construction)
    • 8″ Heavy Cleaning Premium (to be added to Line 4)
    • 8″ Televise Sewer Line Inspection (Post-Construction)
    • 10″ Sewer Cleaning and Televise Sewer Line (Pre-Construction)
    • 10″ Heavy Cleaning Premium (to be added to item 7)
    • 10″ Televise Sewer Line Inspection (Post-Construction)
    • 15″ Sewer Cleaning and Televise Sewer Line (Pre-Construction)
    • 15″ Heavy Cleaning Premium (To be added to item 10)
    • 15″ Televise Sewer Line Inspection (Post-Construction)
  • Manhole Rehab
    • Structural Rehabilitation of MH/Lining, Sealing and Vac Test
    • Reconstruct MH Invert/Connection
    • Rem and Inst New 4″ Sewer Service at Mains and MH
    • Remove and Replace MH Frame and Cover w/Revolution Frame and Cover
    • Remove and Replace MH Frame and Cover w/Heavy-Duty Frame and Cover
    • Raise Existing MH-Adjust MH Rim and Cover to Proposed Grade
    • Remove Existing Cone & Chimney and Rebuild Barrel
    • Install Exterior MH Step
    • 4′ Dia San SWR MH, MH DPT 0-6′, Frame & Cover, Steps, Grout Invert, Neoprene Boots
    • 4′ Dia San SWR MH, Additional depth
    • Sanitary MH Vacuum Testing
  • Traffic Control
  • Dig Work/Open Cut
    • 4″ Cleanout Including Connection to Existing Service with Coupling
    • Remove and Replace 4″ PVC Sewer Lateral
    • Remove and Abandon Sewer Connection & Line
    • 8″ Sanitary Sewer PR (10′ LF) 0-10′ Depth
    • Additional Footage 8″ Sanitary Sewer PR
    • 10″ Sanitary Sewer PR (10 LF) 0-10′ Depth
    • Additional Footage 10″ Sanitary Sewer PR
    • 15″ Sanitary Sewer PR (10 LF) 0-10′ Depth
    • Additional Footage 15″ Sanitary Sewer PR
    • 12″ PVC SDR 26, Grav Swr, 0-15′ Dpt, by Trench Method/Bed Per 4013 details
    • Jack and Bore 24″ Welded Steel Casing w/.375″ Wall Thickness, Including Spacers
    • Connect Proposed 12″ PVC SWR to Exist Wetwell Comp, Inclu Remove/Replace Concrete Wetwell Pad
    • 6″ PVC C900 Class 200 DR21 San SWR Forcemain
    • 6″ Forcemain 45-Degree M.J.D.I Bend
    • Cut Exist 6″ Forcemain and Connect Proposed 6″ PVC Foremain W/6″ M.J.D.I Fittings
    • Remove Existing 6″ Forcemain and Fittings
    • Cut Exist 6″Forcemain and Connect Proposed 6″ Forcemain to San Swr MH
    • Cut and Plug Exist 6″ Forcemain w/Flowable Fill
    • Leakage Testing Sanitary Sewer Pipes
    • Alignment (Lamp) Testing Sanitary Sewer Pipes
    • Deflection (Mandrel) Testing Sanitary Sewer Pipes
    • Trench Stabilization
    • Construction Exit (Co); Installation, Maintenance, and removal
  • Asphalt Restoration
    • Asphalt Pavement Replacement for Sanitary Sewer Installation
  • Bypass
    • Sewer Flow Diversion/Pumping
  • Erosion / Sediment Control
    • Construction Matting; Installation and Maintenance, And Removal
    • Silt Fence (Sd1-S); Installation, Maintenance, and Removal
    • Haybale Chek Dam (Cd-Hb); Installation, Maintenance, and Removal
    • Grassing and Dust Control Measures and Maintenance

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624