Inliner Solutions – ITB: S/M/W & Labor Surplus Certified Firms
Project: Sanitary Sewer Rehabilitation Phase 2
Project Location: Cordele., GA
Bid Due Date: 05/22/2025
Quotes Returned: 05/19/2025
Scopes:
- CCTV/Cleaning
- 8″ Sewer Cleaning and Televise Sewer Line (Pre-Construction)
- 8″ Heavy Cleaning Premium (to be added to Line 4)
- 8″ Televise Sewer Line Inspection (Post-Construction)
- 10″ Sewer Cleaning and Televise Sewer Line (Pre-Construction)
- 10″ Heavy Cleaning Premium (to be added to item 7)
- 10″ Televise Sewer Line Inspection (Post-Construction)
- 15″ Sewer Cleaning and Televise Sewer Line (Pre-Construction)
- 15″ Heavy Cleaning Premium (To be added to item 10)
- 15″ Televise Sewer Line Inspection (Post-Construction)
- Manhole Rehab
- Structural Rehabilitation of MH/Lining, Sealing and Vac Test
- Reconstruct MH Invert/Connection
- Rem and Inst New 4″ Sewer Service at Mains and MH
- Remove and Replace MH Frame and Cover w/Revolution Frame and Cover
- Remove and Replace MH Frame and Cover w/Heavy-Duty Frame and Cover
- Raise Existing MH-Adjust MH Rim and Cover to Proposed Grade
- Remove Existing Cone & Chimney and Rebuild Barrel
- Install Exterior MH Step
- 4′ Dia San SWR MH, MH DPT 0-6′, Frame & Cover, Steps, Grout Invert, Neoprene Boots
- 4′ Dia San SWR MH, Additional depth
- Sanitary MH Vacuum Testing
- Traffic Control
- Dig Work/Open Cut
- 4″ Cleanout Including Connection to Existing Service with Coupling
- Remove and Replace 4″ PVC Sewer Lateral
- Remove and Abandon Sewer Connection & Line
- 8″ Sanitary Sewer PR (10′ LF) 0-10′ Depth
- Additional Footage 8″ Sanitary Sewer PR
- 10″ Sanitary Sewer PR (10 LF) 0-10′ Depth
- Additional Footage 10″ Sanitary Sewer PR
- 15″ Sanitary Sewer PR (10 LF) 0-10′ Depth
- Additional Footage 15″ Sanitary Sewer PR
- 12″ PVC SDR 26, Grav Swr, 0-15′ Dpt, by Trench Method/Bed Per 4013 details
- Jack and Bore 24″ Welded Steel Casing w/.375″ Wall Thickness, Including Spacers
- Connect Proposed 12″ PVC SWR to Exist Wetwell Comp, Inclu Remove/Replace Concrete Wetwell Pad
- 6″ PVC C900 Class 200 DR21 San SWR Forcemain
- 6″ Forcemain 45-Degree M.J.D.I Bend
- Cut Exist 6″ Forcemain and Connect Proposed 6″ PVC Foremain W/6″ M.J.D.I Fittings
- Remove Existing 6″ Forcemain and Fittings
- Cut Exist 6″Forcemain and Connect Proposed 6″ Forcemain to San Swr MH
- Cut and Plug Exist 6″ Forcemain w/Flowable Fill
- Leakage Testing Sanitary Sewer Pipes
- Alignment (Lamp) Testing Sanitary Sewer Pipes
- Deflection (Mandrel) Testing Sanitary Sewer Pipes
- Trench Stabilization
- Construction Exit (Co); Installation, Maintenance, and removal
- Asphalt Restoration
- Asphalt Pavement Replacement for Sanitary Sewer Installation
- Bypass
- Sewer Flow Diversion/Pumping
- Erosion / Sediment Control
- Construction Matting; Installation and Maintenance, And Removal
- Silt Fence (Sd1-S); Installation, Maintenance, and Removal
- Haybale Chek Dam (Cd-Hb); Installation, Maintenance, and Removal
- Grassing and Dust Control Measures and Maintenance
Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624