PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: Allentown Lead Service Line Replacements, Cycle 2 Contracts A & B

Inliner Solutions – ITB: DBE Certified Firms

Project: Allentown Lead Service Line Replacements, Cycle 2 Contracts A & B

Project Location: Lehigh County Authority, PA

Bid Due Date:

                Contact A – October 16th, 2025                                                                                           

Contract B – October 20th, 2025

Quotes Returned:

                Contact A – October 14th, 2025                                                                                                                                 

  Contract B – October 16th, 2025

Scopes:

Aggregate

  • Cold patch
  • Backfill materials
  • Bedding

Open cut/dig

  • Test pit excavation
  • Saw cutting
  • Bedding & Backfill
  • Cold patch temp restoration

Materials

  • Type K cooper piping – NSF 61 – approved for Drinking water, 1” and 2”.
  • Line stops, 4” – 12”
  • Curb stops
  • Curb box
  • Backflow preventors
  • Expansion tanks
  • Full port Valves
  • Pressure reducing valves

Restoration

  • Asphalt driveway pavement
  • Concrete curb replacement
  • Concrete sidewalk replacement
  • Seeding/sod

Allenwood Licensed Plumber

  • Check electrical grounding before cutting into existing water line. Make grounding modifications as required.
  • Installation of new interior copper piping.
  • Installation of new full port ball valves.
  • All required interior piping modifications

Specs/Plans/Questions– Ashden Middlebrooks | ashden.middlebrooks@puriscorp.com | 470-503-5624