PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Inliner Solutions, LLC – ITB:D/M/W/SBE Certified Firms & HUB Section 3

Inliner Solutions, LLC – ITB:D/M/W/SBE Certified Firms & HUB Section 3

Project: Sewer Main Rehabilitation

Project Location: Fayetteville, NC

Bid Due Date: 6/23/2022

Quotes Returned: 6/20/2022


Scopes:

  • Pre CIPP CCTV & Cleaning San. Sewer
    • 6” – 36” Diameter
    • 35,000 LF Total
    • Protruding Tap removal
  • Lateral Rehabilitation
    • Trenchless Mainline Point Repairs (Spot repairs)
      • 8” – 12” Diameter , 10 LF per EA
    • Traffic Control
      • Turnkey single lane closure with flaggers , 12 HR Shift
    • Bypass Pumping
      • Turnkey bypass pumping setup and operations for 21” diameter and greater sewer mains to be lined

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624

Related Posts