Project: Wastewater Treatment Plant A Basin A-08 Rehabilitation
Project Location: Lake Charles, LA
Bid Due Date: 07/19/2022
Quotes Returned: 07/15/2022
Scopes:
- Pre & Post Pipe Burst CCTV & Cleaning , San. Sewer
- 8” Dai. – 18,913 LF
- Manhole Rehabilitation
- 430 VF
- SpectraShield as manufactured by CCI Spectrum, Inc., Triple Shield as manufactured by Triple M Concrete Products, Inc., or approved equal.
- Open Cut Utility Repairs
- Furnish and Install New Precast Manhole 0’‐6′ Deep
- Remove, Dispose Of, and Replace Existing Storm Drain Pipe
- Adjust Existing Water Meters, Valves, and Service Lines
- Point Repair (0.0’ – 6.0’ Deep) For Existing 6 Inch w/ New 6 Inch SDR26 PVC Pipe
- Point Repair (6.1’ – 10.0’ Deep) For Existing 6 Inch w/ New 6 Inch SDR26 PVC Pipe
- Point Repair (0.0’ – 6.0’ Deep) For Existing 8 Inch w/ New 8 Inch SDR26 PVC Pipe
- Point Repair (6.1’ – 10.0’ Deep) For Existing 8 Inch w/ New 8 Inch SDR26 PVC Pipe
- Point Repair (6.1’ – 10.0’ Deep) For Existing 12 Inch w/ New 12 Inch SDR26 PVC Pipe
- Point Repair (6.1’ – 10.0’ Deep) For Existing 24 Inch w/ New 24 Inch SDR26 PVC Pipe
- Furnish and Install New 8″ SDR26 Restrained Joint PVC For Open Cut Replacement of Existing 8” Sewer Including Removal and Disposal of Existing Pipe
- Material Suppliers
- 12” DR 17 HDPE
- 8” DR 17 HDPE
- 6” DR 17 HDPE
- Sewer saddles
- Flexible Tap Saddles, as manufactured by Fernco Systems, T-Flex Sewer Saddles, as manufactured by Mission Rubber Company, or approved equal
- 8” SDR 26 PVC Pipe & Fittings
- 6” SDR 26 PVC Pipe & Fittings
- Precast Concrete Manholes
- Manhole Frame & Covers
- #610 Limestone , Delivered
- Geotextile Fabric]
- Concrete
- Furnish and Install 4″ Thick Reinforced PCC Pavement For Sidewalk Replacement
- Furnish and Install 6″ Thick Reinforced PCC Pavement For Driveway Replacement
- Furnish and Install 8″ Thick Reinforced PCC Pavement For Roadway Replacement
- Asphalt
- Furnish and Install 4″ Asphalt Pavement For Roadway Replacement
- Traffic Control
- Turkey setup & operation of single lane closure with flaggers, 12 HR shift
Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624