PM Construction & Rehab, LLC – ITB: M/WBE Certified Firms
Project: Citywide Wastewater IDIQ FY2022
Project Location: Corpus Christi, TX
Bid Due Date: 10/19/2022
Quotes Returned: 10/14/2022
Scopes:
- CCTV / Cleaning (562998)
-
- Pre Pipe Burst CCTV & Cleaning , Dia. 8” – 42” San. Sewer
- Post Pipe burst CCTV & Cleaning
- Internal Obstruction removal
- Heavy Cleaning
- Open Cut Utility Repairs (238910)
- Sanitary Sewer Point Repairs , 8” – 42” Dia.
- Remove and Replace Sanitary Sewer , 8” – 42” Dia.
- Service reconnections
- Pot holing
- Obstruction removal
- Well Pointing
- Service lateral replacement
- Remove & Replace manholes
- Install new manholes
- Remove & Replace Manhole R&C
- Reconstruct manhole corbel
- Cleanout Install
- Grout fill & abandon WW line
- Temp Construction Entrance
- FRP Manhole Inserts
- Manhole Rehabilitation (237110)
- Polymer Coating
- Spectrashield or Approved Equal
- Concrete Manhole Rehab
- Polymer Coating
- Asphalt & Concrete Restoration (238110)
- Erosion Control (561730)
- Sodding
- Seeding
- Tree Removal
- Silt Fence
- Inlet Barriers
- Material Suppliers (326199)
- 8” – 42” Dia. HDPE DIPS DR 17
- Concrete Manholes
- Fiberglass Manholes
- 8” – 42” SDR 26 PVC
- 8” – 42” PS113 PVC
- Traffic Control (561990)
- Turnkey Setup and operation of Single lane closure with Flaggers , 12 HR Shift
Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624