Project: Sanitary Sewer Rehabilitation by Cured-In-Place Pipe Method

PM Construction & Rehab, LLC – ITB: D/M/WBE Certified Firms

 

Project: Sanitary Sewer Rehabilitation by Cured-In-Place Pipe Method

Project No.: WBS No. R-000266-0351-4, File No. 4258-87

Project Location: Houston, TX

Bid Due Date: 11/10/2022

Quotes Returned: 11/07/2022


Scopes:

  • CCTV & Cleaning  Sanitary Sewer – 562998
    • Pre CIPP-CCTV & Cleaning
    • Siphon CCTV & Cleaning
    • Dye Testing
    • Obstruction removal by Remote

 

  • Open Cut Utility Repairs Sanitary Sewer – 238910
    • Point Repairs
    • Sewer Main Replacement
    • Well Point / Dewatering
    • Remove & Replace concrete manhole
    • Remove & Replace FG Manhole
    • Install Traffic Loop
    • Adjust or Raise existing Manhole
    • Sewer Cleanout Install
    • Junction box Demolition and Install
    • Service Reconnection by Excavation

 

  • Asphalt & Concrete Surface Restoration – 237310 / 238110
    • Concrete Sidewalk & Driveway Replacement
    • Concrete Curb Replacement
    • Asphalt removal & Replacement
    • Backfill
    • Base removal & Replacement
    • Milling & Overlay
    • Concrete ADA Ramp Install

 

  • Manhole Rehabilitation – 237110
    • 1” Concrete Liner
      • Permacast
      • Emaco
      • Reliner
      • Strongseal
    • Rehab of benches & Inverts
    • Manhole Chemical Grouting
    • Grout abandonment of Sewer

 

  • Bypass Pumping – 237110
    • 6” – 12” Dia. Pump setup & Operation

 

  • Landscaping – 561730
    • Tree Removal & Replacement

 

  • Traffic Control – 561990
    • Flagmen

 


Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624